The BP 5C Package works are located to the West side of University Avenue, essentially continuing the works from BP 5A & B. Bid Pack 5C is the continuation of URR (University Ring Road) around Medical Campus, Bridges and other infrastructure works along the URR on the west side.
The project includes:
-Road works including retaining walls, underpass, elevated roundabout, junctions, bridges and other connections such that the SSUC campus is connected to main arterial roads.
-Streetscape including street lights and street landscape along the URR and other street infrastructure.
-Road and surface drainage, pedestrian walk ways, other road safety works.
-Attenuation Tank and Irrigation Tank as part of infrastructure works.
-C3 and C4 Public Shelters in Medical Campus area.
-Utility Tunnel Link from Main Campus to Medical Campus under University Avenue road.
-Landscape works for allocated parcels.
-Fire Station Building.
-Electrical Sub Stations